4. About of the perspective task 2
Below is a summary of one perspective task of optimizing the order of repairing objects in the network of housing and communal services (HCS). It is a further development of the above solvable task 1. For this optimization task do not yet exist means of its solving.
The task 2 has the following new features:
- presence of several different-type mobile repair teams (MRTs) with corresponding transport vehicles (TVs) for their delivery rather than one MRT (with one TV) as in the task 1;
- specifying for each MRT the signs of availability of serving target points (TPs) containing the broken objects of HCS;
- possibility to set the required priority of serving some TPs by any MRT;
- possibility to minimize the total time of serving all TPs by this group of MRTs.
